Sunday, March 2, 2014
March 23
Humberto and I took up the rest of the kitchen's sub floor - mid foundation wall is in poor condition - floor joints sitting on bricks and rocks - all loose.
Built up 3 pillars for the floor joints with brick and mortar. Next time we'll level.
Nanette meanwhile continued removing mortar from mud room wall in preparation of repointing bricks.
March 16
Put vapor barrier in crawl space. Added insulation to kitchen floor and installed sub floor in 1/3 kitchen.
Next time we'll take up rest of kitchen floor and level, sister, etc.
March 9
Humberto and I replaced bottom plate and found live termites. So we sprayed all areas, sistered numerous floor joists and leveled the joists or at least as level as can be in an old house.
Nanette spend the weekend at hospital with Mimi. All is fine. Mimi went in on Thursday with extremely high calcium levels and released on Sunday.
March 8
Humberto, Craig and I moved dresser upstairs. We then tore up about half of the kitchen floor - sub floor.
March 2
Bought backer board for master bath and drywall for kitchen near sink.
Opened the door and heard a rustling sound inside. Not another destructive ground hog? Went upstairs - more rustling. Not scurrying. Not like a ground hog. What Now? In the guest bathroom was a Barred Owl that's 20" high with a 5' wing span sitting on the towel rack. Got my gloves and a stick and opened the windows just in case the owl wanted to leave on his own. Tried to get it to perch on the stick. No go! Would not move. Nanette called Animal Control, and Ed S. was on call, and called back. Nanette explained the situation . He got the address and asked if "The mansion was by the bridge?" Nanette responded "yes". Ed S. stated his wife loves that house and Nanette told him to bring her too. Ed S and his wife Monica arrived in about 15 minutes. Owl had not moved at all. Ed put on long leather gloves and grabbed the owl's talons. He carried it outside and away it flew - beautiful! Afterwards we found a warm "fresh" dead mouse. Maybe it was the owl's snack?? Whoooooo knows! Absolutely no idea how the owl got into the house.
Gave Ed and Monica a tour of the house.
Started to sleet so we left for home. Didn't get much accomplished but exciting!
Saturday, February 1, 2014
February 23
Put together toilet, sink and tub in 1st floor bathroom. Room is now ready for plumbers to finish connecting/installing everything.
Put together vanity 2nd floor quest bath, sink and faucet. Remounted vanity lights to correct height.
February 15 and 16
Humberto helped this weekend. Installed remaining lights in kitchen as well as in the bathrooms. Installed wainscoting in the 1st floor bathroom along long wall and started the other side.
Before any work h - had to clear the driveway of now. Nanette and I wouldn't even pull into the main drive. Had to go on neighbors access road and pull in there just to get truck out of the way. Used tractor to clear drive...found best if used bucket to push the snow like a plow.
Nanette finished mudding the kitchen ceiling...found sanding too difficult. Also started plaster repair.
February 8 and 9
Installed light in mast bath. Fan on 2nd floor porch, all kitchen lights except fan and one in corner. Unloaded 5 of 6 radiators we bought from Mike R for $25 each.
Took Zeke - at end of day he was sure ready to go home. Didn't nap all day even though I put towel down for him to lie on.
Some limbs and trees down from the ice storm earlier this week.
Put together toilet, sink and tub in 1st floor bathroom. Room is now ready for plumbers to finish connecting/installing everything.
Put together vanity 2nd floor quest bath, sink and faucet. Remounted vanity lights to correct height.
February 15 and 16
Humberto helped this weekend. Installed remaining lights in kitchen as well as in the bathrooms. Installed wainscoting in the 1st floor bathroom along long wall and started the other side.
Before any work h - had to clear the driveway of now. Nanette and I wouldn't even pull into the main drive. Had to go on neighbors access road and pull in there just to get truck out of the way. Used tractor to clear drive...found best if used bucket to push the snow like a plow.
Nanette finished mudding the kitchen ceiling...found sanding too difficult. Also started plaster repair.
February 8 and 9
Installed light in mast bath. Fan on 2nd floor porch, all kitchen lights except fan and one in corner. Unloaded 5 of 6 radiators we bought from Mike R for $25 each.
Took Zeke - at end of day he was sure ready to go home. Didn't nap all day even though I put towel down for him to lie on.
Some limbs and trees down from the ice storm earlier this week.
Wednesday, January 1, 2014
Happy New Year! 2014
January 18
Installed master suite hallway light fixtures. Tried to install master bath light but electric receptable is very shallow and screws are too long. Will have to take home and cut down.
Installed base moudling in 1st floor bath. Floor and its unevenness causes mitre joints not to line up right - note to self in future take floor angle into account and cut mitres.
Nanette continued to work on taping kitchen ceiling and took down 1/2 of the corner angle on steps
January 12
Bob cut out sink in the 2nd floor guest bathroom vanity.
Brought vanity home to re-finish because of the cold temp at Trevanion.
Bob installed fan/light in game room.
Got IRIS back up and running
Nanette painted trim for 1st floor bath and worked on mudding ceiling.
January 11
Bob started to cut base moulding but found the compound mitre saw (10") was too small for the job as well as for crown moulding. So of course, he went to Lowes and bought a 12" DeWalt compound miter saw and portable table for it $400. WHAT POWER!
When he returned he cut thebase moulding (rough cuts on lengths) so Nanette can paint them before installing.
Nanette spent day mudding the ceiling Kitchen.
Tons or rain yesterday and today we found the natural path the water travels on the front 40. It isn't right. Bob marked where the stream needs to go and this spring he can dig a trench so it will run into the existing stream.
January 5
Working again!
Our plan was to work on the 1st floor bathroom but temp inside was 34 degrees - too darn cold to work! Decided another day would be better. Went home to get warm....
January 1
Celebrated New Year Day by working.
Started off by laying new flooring in the 1st floor basthroon.
Also started mudding kitchen ceiling.
Put dehumidifier in front basement. The humidity was 85% since the fans do not operate less then 40 degrees.
Installed master suite hallway light fixtures. Tried to install master bath light but electric receptable is very shallow and screws are too long. Will have to take home and cut down.
Installed base moudling in 1st floor bath. Floor and its unevenness causes mitre joints not to line up right - note to self in future take floor angle into account and cut mitres.
Nanette continued to work on taping kitchen ceiling and took down 1/2 of the corner angle on steps
January 12
Bob cut out sink in the 2nd floor guest bathroom vanity.
Brought vanity home to re-finish because of the cold temp at Trevanion.
Bob installed fan/light in game room.
Got IRIS back up and running
Nanette painted trim for 1st floor bath and worked on mudding ceiling.
January 11
Bob started to cut base moulding but found the compound mitre saw (10") was too small for the job as well as for crown moulding. So of course, he went to Lowes and bought a 12" DeWalt compound miter saw and portable table for it $400. WHAT POWER!
When he returned he cut thebase moulding (rough cuts on lengths) so Nanette can paint them before installing.
Nanette spent day mudding the ceiling Kitchen.
Tons or rain yesterday and today we found the natural path the water travels on the front 40. It isn't right. Bob marked where the stream needs to go and this spring he can dig a trench so it will run into the existing stream.
January 5
Working again!
Our plan was to work on the 1st floor bathroom but temp inside was 34 degrees - too darn cold to work! Decided another day would be better. Went home to get warm....
January 1
Celebrated New Year Day by working.
Started off by laying new flooring in the 1st floor basthroon.
Also started mudding kitchen ceiling.
Put dehumidifier in front basement. The humidity was 85% since the fans do not operate less then 40 degrees.